IP68 7070 SMD LED High light efficiency light control module for Customizable and Versatile Outdoor Lighting Solutions
The IP68 7070 SMD LED High-Efficiency Light Control Module is a cutting-edge lighting solution designed for outdoor applications that demand durability, energy efficiency, and versatility.
Detailed
Base Material | Aluminum |
Input Voltage | 48-54V DC |
Output Power | 30W- 75W (customizable) |
Luminous Efficacy | 160lm/W-220lm/W |
Certification | ROHS |
Led Chip | 7070 SMD LED |
Waterproof | Waterproof |
Warranty | 5years |
IP Rating | IP68 (Dustproof and waterproof) |
Colour Temperature | 2700K-6500K(according to your choose) |
Service Providing | PCB Production, PCB Assembly, Components Sourcing |
Origin | China |
Samples | Avaiable |
Transport Package | Carton |
Color Rendering | RA70 RA80 |
Module Dimension | 298X75X47mm |
Delivery time | 7-10days |
Shipment | By DHL/FEDEX/UPS express,Sea or Shipping for your choice |
Description
7070 SMD LED Chip: Utilizes high-efficiency 7070 SMD LED chips, offering superior brightness and energy savings.
Specifications
Product Name: | CM-GH36KH-XX-C |
Beam Angle: | T2M,T3 |
Temperature: | 2700~6500K |
Ambient temperature range: | -40℃~+50℃ |
Lumen s Flux(Type.) | >130lm/W |
Heat sink | AL Extrusion 6063 |
LIFE SPAN | ≥50000 小时 @Ta=25℃ |
Application: | Flood Lighting,Led Street Lighting ,Tunnel lighting |
WARRANTY: | 5 Years |
Quatity Guarantee: | If you receive a defective item, please email us a picture of the defective part. We will arrange for a reshipment or refund to you. |
Main Maket | Europe,South America,North America,Asia ect |
Shipping and Delivery
Trade Terms: |
EXW , FOB , CNF , CIF |
Payment Terms: | T/T , PayPal , Western Union, Moneygram |
Delivery time: | 2-3 working days for samples order, 5-7 working days for bulk order |
Shipment Terms | By Sea, By Air, By Express like DHL, Fedex, UPS, TNT, etc |
Drawing
Application
Notices
FAQ
1) Can I have a sample order?
A: Yes, we welcome sample order to test and check quality.
Mixed samples are acceptable.
3) What is the lead time?
A:Sample needs about 3-5 days prepared; mass production time needs 7-10 days normally.
Contact Us at Any Time